Our strength is to execute the job in time giving us an edge in cost effective with the global supplier of clean room in the industry.
We have dedicated team to cater the Clean room projects for Modular partition paneling, Ducting, Electrical, HVAC - low and High side, Flooring etc with strong designing team to meet the desired condition with low running cost. Apart for cost effective and running cost -we emphasis equaliy on Aesthetic look which goes long way in defining the quality of the Projects and speaks the our volume to do the job.
The Clean room projects are taken care by our dedicated strong Designing backed up by Planning and project team and Specialized trained staff for execution with safety norms being followed at every step.
Read More...We have all range of Modular Partition Panel in Double skin construction with Puff or Rockwool Insulation to supply to meet the technical aspect for the Clean room finishes.
Read More...HVAC for cooling and heating depends on the exterior climate and interior specified conditions. Taking in account the heat load calculation, it is necessary to find fresh air requirements for each area in detail, as pressurization...
Read More...We have all range of laminar air flow unit of class ISO 5 in SS 304-316 L and are built as per the customer requirement. The laminar air flow unit are manufacture in Double skin construction in SS 304 / 316 L with Puff insulation
Read More...Dispensing booth and sampling of class 100 are made in double skin construction in SS 304 / 316 L with puff insulation to give the dynamic look and to avoid the vibration during operation.
Read More...Bio safety of class 100 are made in double skin construction in SS 304 / 316 With puff insulation to give the dynamic look and to avoid the vibration during operation.
Read More...Air showers are self contained chamber and are used to de-particulate the fully gowned personnel for entry and exit in the clean room of critical area or Area with higher class to avoid the cross contamination caused by particulate matter.
Read More...In pharma application the movement of personal and material are to be different to avoid the cross contamination. Hence the material are passed though Pass Boxes to move the material within the clean room and grey area..
Read More...Director Suratrakthdan kendra Research center
We like to congrats ”Cleanroom Global Projects” ” Located in Mumbai for Designing and executing the Modern facility of Modular Clean room of class 1000 and 10000 for the chord blood processing and research work for Surat rakthdan Kendra research center and helping us to get NABL certification
Director Span Diagnostics ltd
We are thankful for excellence in setting up the Modular Clean room facility at Gujarat by ”Cleanroom Global Projects”